Optimizing of discrete time-cost in construction projects using new adaptive weight formulations

dc.authorid0000-0001-8734-6300en_US
dc.authorid0000-0001-7514-8956en_US
dc.authorid0000-0001-9672-2232en_US
dc.contributor.authorToğan, Vedat
dc.contributor.authorBerberoğlu, Neslihan
dc.contributor.authorDede,Tayfun
dc.date.accessioned2021-12-01T12:21:04Z
dc.date.available2021-12-01T12:21:04Z
dc.date.issued2021
dc.departmentAÇÜ, Borçka Acarlar Meslek Yüksekokulu, İnşaat Teknolojisi Bölümüen_US
dc.description.abstractIn this paper, four new adaptive weight formulations are developed to enhance the performance of traditional Modified Adaptive Weight Approach (MAWA), which is the simplest way for solving the multi-objective optimization of discrete time-cost trade-off problem (DTCTP). Several numerical experiments are conducted to validate the newly proposed formulations. In addition, three meta-heuristic-based optimization algorithms are utilized to examine the variations within the results of the test instances. The proposed model provides several ways to solve DTCTP, as it includes different formulations and optimization algorithms. So, this model performs well for the medium and large-scale time-cost optimization problems on contrary to the traditional MAWA.
dc.identifier.citationToğan, V., Berberoğlu, N., & Dede, T. (2021). Optimizing of Discrete Time-Cost in Construction Projects Using New Adaptive Weight Formulations. KSCE Journal of Civil Engineering,en_US
dc.identifier.doi10.1007/s12205-021-0783-5
dc.identifier.issn1226-7988
dc.identifier.scopusqualityQ2
dc.identifier.urihttps://hdl.handle.net/11494/3571
dc.identifier.volumeArticle in pressen_US
dc.identifier.wosqualityQ3
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.institutionauthorBerberoğlu, Neslihan
dc.language.isoenen_US
dc.publisherSpringer Verlagen_US
dc.relation.ispartofKSCE Journal of Civil Engineering
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectConstructionen_US
dc.subjectTime-cost trade-off problemen_US
dc.subjectMulti-objective optimizationen_US
dc.subjectMetaheuristic algorithmsen_US
dc.subjectTime-cost optimizationen_US
dc.titleOptimizing of discrete time-cost in construction projects using new adaptive weight formulationsen_US
dc.typeArticle

Dosyalar

Orijinal paket
Listeleniyor 1 - 1 / 1
[ X ]
İsim:
vedat_togan.pdf
Boyut:
937.11 KB
Biçim:
Adobe Portable Document Format
Açıklama:
Lisans paketi
Listeleniyor 1 - 1 / 1
[ X ]
İsim:
license.txt
Boyut:
1.44 KB
Biçim:
Item-specific license agreed upon to submission
Açıklama: